Cross Connection Control Plan Check Application

"*" indicates required fields

APPLICATION PACKAGE REQUIREMENTS FOR PLAN APPROVAL
Prior to plan approval, the District must have the following items executed by the Developer:
$434 Plan Check/Inspection Fee made payable to Rowland Water District. (Fee applies to the plan check and inspection for one backflow assembly).
1 (ONE) CD or flash drive of the first submittal PDF or 2 (TWO) 24 x 36 first submittal drawings needs to be submitted.
*Assembly type and location requires approval by Rowland Water District Prior to Installation

APPLICANT INFORMATION
Company Address * Required

PROJECT INFORMATION
Project Address * Required
I, the [applicant] for this Cross Connection Control Plan Check Application, warrant the truthfulness of the information provided in this application. I understand that typing the name constitutes a legal signature confirming that I acknowledge and agree to the above Terms of Acceptance.
MM slash DD slash YYYY
FOR DISTRICT USE ONLY
MM slash DD slash YYYY
Max. file size: 200 MB.