Contractors/Developers

POLICIES & PROCEDURES:

Rowland Water District Service Area

Water Meter Installation Costs 2016-2017

Backflow/Cross Connection Control Procedures

Install Specification for Reduced Pressure Backflow Prevention Assembly
RP install spec 2014 Updated
Install Specification for Double Detection Check Backflow Prevention Assembly
DCDA Install Spec 2014
Onsite Construction Requirements for Commercial Irrigation Systems

L.A. County DPH Guidelines For Recycled Water Pipeline Construction and Installation

Policy For New Water Service Installations

STANDARD DESIGNS FOR:

3/4″ AND 1″ SERVICE
3/4″ AND 1″ SERVICE W/OPTIONAL FIRE SYSTEM SUPPLY
1-1/2″ AND 2″ SERVICE
1-1/2″ AND 2″ SERVICE W/ OPTIONAL FIRE SYSTEM SUPPLY
2 ” BLOW-OFF ASSEMBLY
1″ AIR RELEASE VALVE ASSEMBLY
6″ FIRE HYDRANT ASSEMBLY
VALVE BOX AND COVER (IN ASPHALT PAVEMENT)
VALVE BOX AND COVER (IN CONCRETE PAVEMENT)
VALVE BOX AND COVER (IN CONCRETE SIDEWALK)
(CONC. PVMT) VALVE BOX AND COVER FOR RECYCLED WATER
VALVE STEM EXTENSION
CONCRETE THRUST BLOCKS
TYPICAL TRENCH
SHALLOW EXCAVATION OVER EXISTING WATER MAIN

REQUESTS FOR:

Potable/ Recycled Water Service Installation
Recycled Water Use Permit Application
Temporary (Construction) Water Service
Utility Information
“Will-Serve” Letter
Fire Flow Availability Test
Backflow Test